Project Description
PROJECT: FCU INSTALLATION
LOCATION: SYDNEY CBD
Two new fan coil units (FCUs) were required to accomodate the new load for the service area. The FCUs were mounted on a custom built frame and connected to the existing chilled water system. The ductwork was modified to suit the new airflow. A new mechanical switchboard was installed with an Innotech Maxim III controller and alarm points. This project was completed ahead of time and within budget.