Project Description

PROJECT: FCU INSTALLATION

LOCATION: SYDNEY CBD

Two new fan coil units (FCUs) were required to accomodate the new load for the service area.  The FCUs were mounted on a custom built frame and connected to the existing chilled water system.  The ductwork was modified to suit the new airflow.  A new mechanical switchboard was installed with an Innotech Maxim III controller and alarm points.  This project was completed ahead of time and within budget.

Project Details