Project Description
PROJECT: PCU INSTALLATION
LOCATION: SYDNEY CBD
Three new process cooling units were required to service a new target area in a multistorey CBD located building. A new purpose built plantroom was constructed and pipework connected from the existing main headers. New mechanical switchboards with ATS were installed including BMS surveying, alarm points and return fan control. A high level ductwork system was also supplied and connected to serve the new target area. The fire protection system was upgraded for compliance including sprinklers, warning systems and a fire trip. This project was completed within budget and on time.